Laserfiche WebLink
MR 178 EMD vent fan silencer 4/9/02 <br />MR 179 New water line from Fish Creek borehole to 7 North escape shaft and <br /> miscellaneous 9/5/02 <br />MR 180 Correction to monitoring requirements for site 302 8/27/02 <br />MR 181 Expansion of low quality coal stockpile 11/22/02 <br />MR 182 Re-orientation of northwest mains 4/3/03 <br />MR 183 Borehole for compressed air line 5/7/03 <br />MR 184 Access/haulroad surfacing project 6/2/03 <br />MR 185 Transfer building addition and propane heater line 10/3/03 <br />MR 186 Addition of new magnetite storage bin and correction to cost estimate <br /> for MR-185 10/10/03 <br />MR 187 Northwest Mains vent fan silencer 1 (/10/03 <br />TR 35 Update operator of FCBH treatment facility, installation of additional <br /> equipment 4/14/00 <br />TR 36 Extension of development mining in the 12 R gateroad and limited in <br /> 12 and 3/10/00 <br />TR 37 Add NMD power drop facility 6/14/00 <br />TR 38 Hydrologic monitoring plan modification 9/4/01 <br />TR 39 N W mains vent shaft and waste slung underground disposal project 10/4/01 <br />TR 40 Responses to item l and 4 of DMG's 4/Ol Midterm Review 3/26/02 <br />TR 41 Revised design for batch loadout haul road 7/19/02 <br />TR 42 Reduction of hydrologic monitoring 5/23/03 <br />Upon cessation of mining activities, all surface disturbance will be reclaimed. Surface facilities will be <br />removed. The portal area, Area 2 pit and the waste disposal site will be backfilled with previously mined <br />spoils existing within areas adjoining the old Energy No. 1 pit. All surface disturbance will be regraded to <br />approximate original contour. Topsoil from existing and proposed topsoil stockpiles will be redistributed <br />over the entire disturbed azea to depths 0.7 feet to 0.8 feet as depicted on Map 29 of the permit application, <br />with the exception of those piles which are dedicated to specific areas from which it was removed. Re- <br />seeding and revegetation will occur following topsoil laydown operations. Reclamation success will be <br />determined by statistically comparing the reclaimed areas to reference areas, except at the Fish Creek <br />Tipple, which was constructed prior to implementation of the current laws and regulations. <br />