My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32065
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:50 PM
Creation date
11/23/2007 7:10:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
General Documents
Doc Date
3/23/1995
Doc Name
TRINIDAD BASIN MINE C-82-055 LINDEN AV LOADOUT COAL MATERIAL SAMPLING FINAL LABORATORY REPORT
From
DMG
To
SANTA FE RAILWAY CO
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman Si., Room 215 `y <br /> <br />Denver. Colorado 80203 I <br />~~ <br /> <br />Phone 130118663567 II <br />FAX: 13031 832-81 06 <br />March 23, 1995 DEPARTMENT OF <br /> NATURAL <br />Mr. Ralph Ponce RESOURCES <br />Track Supervisor Roy Romer <br />Santa Fe Railway Company c°°ef°°` <br /> <br />500 Arizona Street lames 5. lochhead <br />E.ec°~~~e D~re~~°r <br />Trinidad, Colorado 81082 Michael B long <br /> Dwis~on Dlreclor <br />Re: Trinidad Basin Mine (C-82-055) Linden Avenue Loadout Coal Material <br />Sampling, Finaf Laboratory Report <br />Dear Mr. Ponce: <br />I am forwarding the final report to you of the results of the coal material sampling the <br />Division conducted on February 21, 1995 at the Linden Avenue Loadout associated with the <br />Trinidad Basin Mine revoked mining permit. This report includes all laboratory quality <br />control and method references. <br />To apprise you of the bid amendment that will be issued later today for the work at the <br />Trinidad Basin Mine site and Linden Avenue Loadout, the task involving coal material at <br />the loadout has been revised. The task will no longer involve removal and haulage of all <br />estimated coal material on site (approx 10,000 cu.yd.). This task has been revised to regrade <br />the existing material away from the track at a grade of 1% for 50 feet east of the track, and <br />either regrade it on-site. I will send the revised bid amendment to you when it is available. <br />If you should have additional questions or concerns with this revised plan, please call. <br />Sincerely, <br />~~~~=~ Gnu,.. ~~, <br />Janet . Binns <br />nviro ental Protection Specialist <br />c:\jhb\C81048\fi nal.lab <br />
The URL can be used to link to this page
Your browser does not support the video tag.