Laserfiche WebLink
<br />- iii~iiiiii~~iiai~i <br />999 <br />STATE OF COLORADO <br />Roy Ramer, Governor <br />Patricia A. Nolan, MD, MPH, Executive Director <br />Dedicated to protecting and improving the health and environment o(the people of Colorado <br />DenOverhColo~ do soi2z-, s3o 4210 E. 11th Avenue <br />Phone (3031692-2000 Denver, Colorado 80220-37,6 RECEIVEQ <br />(303) 69,-4700 <br />November 14, 1994 <br />NOV ~ 7 1994 <br />Division of mrnerais tt ueo)ogy <br />Mr. Bradley J. Nelson <br />Nelson-Clark Remediation, Inc. <br />4500 Dell Range Boulevard <br />Cheyenne, Wyoming 82009 <br />~~oF ~~~ <br />Nc <br />. ~ w <br />tr/a 76~• <br />Colorado Department <br />of Public Health <br />and Fl,vi,onment <br />Re: Remedial Activities, Trinidad Railway Maintenance Facility at New Elk Mine <br />Las Animas County, Colorado <br />Dear Mr. Nelson: <br />The Hazardous Materials and Waste Management Division of the Colorado Department <br />of Public Health and Environment (the Division) has received and reviewed the <br />Proposed Work Plan for the above referenced facility. The work plan was revised in a <br />September 14, 1994 letter to the Division. The revision indicated that all petroleum <br />contaminated soils found on-site, would be treated on-site, at two areas approved for bio- <br />remediation by the Division of Minerals and Geology of the Colorado Department of <br />Natural Resources. Originally, the work plan indicated that on-site petroleum <br />contaminated soils would be disposed of off-site at a Waste Management of North <br />America landfill. <br />The work plan indicates that a written release report would be submitted .to the <br />Colorado Department of Public Health and Envirer,ment (CDPHE). The wcrk plan <br />indicated that this report would be submitted to Ron Farling (sic) and Gary Sldano (sic) <br />of CDPHE. The report should be submitted to Ronald J. Forlina of the Division, and <br />Gary Soldano of the Water Quality Control Division. As of this date, the written report <br />of release has not been made. <br />The Division approves of the revised plan of work, with the provision that the written <br />report of release be made to the appropriate parties. <br />