Laserfiche WebLink
ASSESS THIS GYPSUM DEPOSIT AND DECIDE ITS PERMIT STATIS ACCORDINGLY. GIVEN THIS <br />SCENARIO, I FEEL THAT IT WOULD BE POSSIBLE TO COMPLETE THE WORK ABOVE THIS WINTER AND <br />ATTEMPT TO ACQUIRE TC STATIS FOR SIX MONTHS. <br />PROPOSAL # I COST ..........................................................................$S000.OO <br />DURATION OF PROJECT ....................................................... ................. 60 DAYS <br />PROPOSAL #2-COMPLETE RESERVE STUDY OF GYPSUM RESERVE AND WASTE MATERIALS TO BE <br />MINED (STRIPPING RATIO) FOR WALLBOARD AND CEMENT ROCK USAGE. THIS WILL INCLUDE AN <br />ASSESSMENT OF VOLUMES OF MINEABLE SULPHATE BASED ON GYPSUM GRADE, CARBONATE <br />CONTENT, ANHYDRITE CONTENT, AND INSOLVABLE CONTENT FOR CEMENT RETARDER ROCK AND <br />A CALCULATION OF ALL WASTE VOLUMES NECESSARY TO MINE THE GYPSUM RESERVE. A FINAL <br />REPORT WILL BE IN THE FORM USABLE FOR POTENTIAL SALE OF THE MINERAL DEPOSIT. <br />MINE RESERVE ANALYSIS ........................................................................~i2500.00 <br />DURATION OF PROJECT ............................................................. .. .. .........30 DAYS <br />I AM AWARE OF THE LIMITATIONS YOU ARE UNDER DURING THE TRANSITION. I APPRECIATE YOUR <br />CONSIDERATION OF THE ABOVE PROPOSALS AND LOOK FORWARD TO HEARING FROM YOU ON THIS <br />MATTER AS SOON AS IS CONVENIENT FOR YOU. I BELIEVE THE WORK ABOVE WILL KEEP THE STATE <br />OFF YOUR BACKS FOR A THE AND HAVE MAXIMUM INFORMATION AVAILABLE FOR DECISION MAKING <br />WHICH MUST MADE WITHIN THE NEXT 6 MONTHS CONCERNING THE COALDALE PROPERTY. <br />YOU WILL ALSO FIND THREE PROPOSALS FOR VARIOUS FIELD WORK PROJECTS TO BE PERFORMED <br />IN 996. THESE THREE PROPOSALS INCLUDE FURTHER RECLAMATION WORK IN THE NORTH <br />DUMP AREA, LOOSE ROCK VENEER REMOVAL IN THE GOLD HILL AREA, AND HIGH WALL AND MINE <br />BENCH REMOVAL VIA DRILLING, BLASTING, AND BULLDOZER WORK ON THE GOLD HILL HIGH WALL <br />ADDRESSING SOME OF THE STATES SAFETY AND CLOSURE CONCERNS WHILE NOT REDUCING THE <br />GYPSUM ROCK RESERVE POTENTIAL BY COVERING GYPSUM ORE. THESE PROPOSALS ARE MUCH <br />MORE EXPENSIVE AND INVOLVE SUB-CONTRACTORS, ADDITIONAL EMPLOYEES ON AZURITES PART, <br />AND FULL THE ATTENTION TO THESE PROJECTS THIS SUMMER AND FALL. WHILE I AM AWARE OF <br />DOMTAR~S UNCERTAINTY IN THIS AREA, I WOULD AGAIN ASK FOR YOUR CONSIDERATION OF THIS <br />WORK AS SOON AS REASONABLY POSSIBLE AND YOUR HELP IN FORWARDING THESE PROPOSALS TO <br />THE APPROPRIATE MANAGEMENT PERSONNEL AS THE SITUATION WARRANTS. PLANT MATERIALS <br />COMMITTM ENTS ARE ALREADY OVERDUE AND I HOPE YOU CAN APPRECIATE MY POSITION IN NEEDING <br />TIME TO GET MV EMPLOYEE AND SUBCONTRACT COM MITTMENTS ORGANIZED FOR THE 1996 FIELD <br />SEASON. THANK YOU ONCE AGAIN FOR YOUR TIME AND CONSIDERATION. <br />VERY TRULY YOURS, <br />KENNETH S. KLCO <br />AZURfTE, INC. <br />