Laserfiche WebLink
III IIIII(IIIIIIIIII <br />EASTSIDE COAL COMPANY, INC. <br />RECEIVED <br />APR -;~ 1985 <br />P. o. aox i6: ;r11NED LAND RECLAMATION OIVISIn~ <br />s~),,coio~~aoei6sz COIO.Dept.otNaturaiAevoa~ <br />(303) 8762944 <br />April 2, 1985 <br />Joe Oliver, Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman St. <br />Denver, CO 80203 <br />Re: Eastside Coal Company, Inc. Permit No. C-84-063 <br />Stipulation No. 8 and Stipulation No. 9 <br />Dear Mr. Oliver: <br />Stipulation No. 8 requires a stability analysis of the steep- <br />est slopes constructed during the reclamation phase of the <br />permit. Revised page 101 lists the minimum safety factor of <br />2.8 for the reclaimed areas. <br />Stipulation No. 9 requires the elimination of the discharge <br />pipes in the subdrain system of the waste pile. Revised <br />pages 97C, 97D, & 97-D1 removes the discharge pipe and re- <br />places the pipe with a gravel drain. <br />The revised study prepared by Lambert and Associates dated <br />March 14, 1985, needs to be inserted in Appendix K. <br />Sincerely, <br />jl ., ~'~" <br />Stephen Se]fi <br />General Manager <br />Enclosures <br />SS/mr <br />