My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31848
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31848
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:44 PM
Creation date
11/23/2007 7:06:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
General Documents
Doc Date
10/21/1991
Doc Name
FEDERAL LEASE COC-49465 (5) LETTERS OF CONCURRENCE
From
usfws
To
osm
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(. <br />• present capacity of 100,000 to 150,000 tons per year. Mine life of the <br />tract is 7 to 10 years at this level of production. <br />Equipment - The anticipated level of production rill be accomplished rith <br />two continuous miner units, one producing coal 10 unit-shifts per week, <br />the other 10 - 15 unit shifts per veek. <br />Basic equipment is listed below: <br />2 Continuous Miners 2 Roof Bolters <br />9 Shuttle Cars 2 Feeder Breakers <br />2 Power Centers 2 Sump Pumps <br />36 Inch Conveyor Belt System 2 Auxiliary Faas <br />2 Utility Vehicles 1 LHD <br />Surface Facilities Yent Tubiaq <br />Manporer - Manpower to operate 2 production sections one shift per day, <br />one maintenance shift, and surface and office staff totals 40 employees. <br />An additional 8 to 10 employees could be required at full production to <br />operate an additional production shift on one section. <br />- Surface Facilities and Transportation - No nev surface facilities rill be <br />required if National King is the successful bidder. Blue Flame would be <br />required to construct a tipple, office, rarehouse, bath house, scale, and <br />a septic tank and drain field. Additionally, the-electrical transmission <br />system, mine portals and access road rill require upgrading. <br />• All coal will be trucked from the mine site as the nearest railroad is at <br />Gallup, Nex Mexico. Currently an average of 22, 26-30 ton trucks per day <br />are required at National Ring Coal's operation. This vould increase to <br />approximately 33 trucks per day at full production of 150,000 tons per <br />year. Additionally; an undetermined number of pickup trucks and small <br />trailers haul coal for the domestic market. <br />Estimated Recovery - Recovery should meet or exceed 55 percent of the <br />in-place/minable reserve base of 1,833,000 tons. <br />Potential Markets - National Rinq Coal is supplying the available market <br />at present, which primarily consists of cement plants in New Mexico and <br />Arizona, the Durango-Silverton Narrox Gauge Railroad, and domestic coal <br />users. If Blue Flame is the successful Bidder, it rill be probably be <br />supplying the same market that National Ring Coal ie cnrreatly supplying. <br />The lack of any other coal mines in the Durango area indicates that no <br />other coal markets exist in the immediate area due to the level of <br />industry in the area and the distance from rail haulage <br />MARIMUM ECONOMIC RECOVERY DETERMINATION <br />It has been determined by HLM mining engineers that Maximam Economic <br />Recovery (MER) of this Federal Lease tract can be achieved by underground <br />mining using the room and pillar method of mining as described in this <br />• report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.