My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31731
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31731
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:42 PM
Creation date
11/23/2007 7:04:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
General Documents
Doc Date
7/16/2007
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART f -INTRODUCTION <br />Purpose of this Document <br />This document presents the results of the Midterm Permit Review of Eastside Coal Company, <br />Inc.'s Eastside Mine. The Colorado Division of Reclamation, Mining and Saftey ("DBMS") <br />conducted this review for the purpose of fulfilling the requirements of the Colorado Surface Coal <br />Mining Reclamation Act (the "Act"), and the Regulations of the Colorado Mined Land <br />Reclamation Boazd for Coal Mining (the "Regulations"). <br />Organization of this Document <br />This document is divided into the following three parts: <br />Part I -Introduction <br />Part II -Summary of Operations, Revisions to Permit, <br />Violations, Stipulations, Variances, and Bond <br />Part III -Requested Revisions of Permit Application <br />Midterm Review Requirements of the Regulations <br />Section 2.08.3 of the Regulations requires the Division to conduct a general review of each <br />mining and reclamation permit prior to the middle of the permit's teen (2 t/2 years). Based on <br />this Midterm Review, for good cause shown, the Division may require the permittee to revise or <br />modify the permit in order to ensure compliance with the Act and the Regulations. <br />Table 1, below, lists the other Sections of the Regulations that require a Midterm Review of <br />specific aspects of each permit. <br />Table 1-Specific midterm review topics <br />Section Topic <br />Applicability at the <br />Eastside Mine <br />2.06.2(10) Experimental practices Inapplicable, no <br />such practices. <br />2.06.3(4)(a) Mountaintop removal Inapplicable, no <br />variances such variances. <br />Eastside Mine Page 2 July 16, 2007 <br />Midterm Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.