Laserfiche WebLink
Page 2 <br />Work, for the remainder of this year, if ground conditions allow, <br />and for the 1995 field season will involve construction of the 14 <br />terraces called for in the plan. These will be constructed <br />starting with the furthest set of terraces up the draw and <br />advancing down dip. <br />Should you have any questions regarding this material, please <br />contact me at the mine site. <br />Sincerely, <br />David Beverlin <br />Resident Engineer <br />