Laserfiche WebLink
• iii iiiiiiiiiiiu iii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />131 3 Sherman St., Room 215 II~~~ <br />Denver, Colorado 80203 I <br />Phone. 13031 866-3 567 <br />FAX. (301183?-8106 <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />DATE: MdrCh 23, 1995 Rov Romer <br />Gove.nor <br />T0: Maggie Van Cleef, Division of Minerals and Geology IamesS LOChhead <br />Execmf.e Dueao. <br />FROM: Yvonne Brannon, Division of Minerals and Geolo Michael B. Long <br />9Y Division Director <br />RE: PRE-BID MEETING ATTENDEES, TRINIDAD BASIN MINING <br />BID NUMBER MVC-MINES-348 <br />The following contractors attended the on-site pre-bid meeting for the <br />Trinidad Basin Mining Project on March 17, 1995 and were Sent the attached <br />amendments to the Invitation for Bid Documents: <br />Phil Kessler <br />Kessler Reclamation <br />P.O. Box 41 <br />Rockvale, CO 81244 <br />Clark Leggitt <br />Colorado West Leasing <br />241 31 3/10 Road <br />Grand Junction, CO 81503 <br />Glenn Moltrer <br />Purgatoire Valley Const <br />23478 Hwy 12 <br />Trinidad, CO 81082 <br />Robert Martinez <br />Mesa Paving <br />1960 Aspen Circle <br />Pueblo, CO 81006 <br />Anthony Avila <br />Pridemore Construction <br />12750 Highway 291 <br />Salida, CO 81201 <br />Norman Berry <br />Berry Trucking & Excavating <br />8561 S. Ammons <br />Littleton, CO 80123 <br />Dan Eveatt <br />TLM Constructors <br />P.O. Box 505 <br />Swink, CO 81077 <br />Paul King <br />Mesa Construction <br />Box 1 <br />Cotopaxi, CO 81223 <br />Bob Whitaker <br />Inc. James Healey <br />Spanish Peaks Construction <br />22490 Co Rd. 41.6 <br />Gulnare. CO 81020 <br />Doug Krohn <br />Ramstetter Excavating <br />1120 Secrest <br />Golden. CO 80401 <br />Tom Augustine <br />Febbraro Construction <br />Box 720 <br />Trinidad, CO 81082 <br />