My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31636
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:40 PM
Creation date
11/23/2007 7:03:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
9/2/1994
Doc Name
CRESSON PROJECT PN M-80-244 COMMITMENT 33 SPECIFICATIONS INSTALLATION OF LEAK COLLECTION RISER PIPES
From
CRIPPLE CREEK & VICTOR GOLD MINING CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> SUBJECT: HDPE Pi a D esign <br />GOLDER Job Number: 933-2720 Made by BES Date: S/25/94 <br />ASSOCIATES Ref: Checked; Sheet of <br /> Reviewed: <br /> Fil~NUm: plpe2~20.vgt <br />CONCLUSION; The HDPE pipe will be able to withstand the proposed overburden loads <br />in the heap pad. The pipe will possess the <br />following safety factors. <br />Wall Crushing Safety Factor: 2.05 <br />Wall Buckling Safety Factor: 1.50 <br />Pipe Deflection Safety Factor: 1.90 <br />In addition, the calculated pipe deflection is below <br />the manufacturer's suggested allowable defection: <br />Pipe Deflection: 1.42 percent <br />Allowable Deflection: 2.70 percent <br />
The URL can be used to link to this page
Your browser does not support the video tag.