My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31629
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:40 PM
Creation date
11/23/2007 7:03:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977573
IBM Index Class Name
General Documents
Doc Date
4/7/1995
Doc Name
SPECIAL USE PN 479
From
BOARD OF CNTY COMMISSIONERS
To
DNR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />March 30, 1995 <br />Mr. Steven Meier <br />Pueblo County Planning Department <br />1120 Court Street <br />Pueblo, CO 81003 <br />Re: SUP No. 479 Amended <br />Dear Steven: <br /> <br />VALCO, INC. <br />CORPORATE OFFICE <br />P.O. BOX 550 <br />ROCKY FORD, COLORADO 8067 <br />(719) 254-7464 <br />FAX 779254-7468 <br />You have asked for a letter describing how our mining operation will be conducted once we are <br />north of the river. We will be conducting our operations similarly to what we have done on the <br />south side of the river for the last twenty three yeazs. <br />The DMG reclamation permit with the included mining plan and reclamation plan will remain the <br />same. We will be mining generally from south to northwest to east from a point starting at the <br />location of our bridge across the Arkansas river. <br />We will be mining with equipment as spelled out in the permit. The mined material will be <br />transported over the bridge to the plant by conveyor as it has been in the past. <br />The normal operation has not included Sundays except in instances of emergency. <br />Valco, Inc. feels compelled to point out that we believe SUP 479 Amended does not require the <br />review before we begin mining on the north side of the river. However, we should not begin that <br />operation until after April 25, 1995. <br />Sincerely, <br />Valco,`Inc~. <br />1~~'h.uti`a~,..-- <br />Thomas E. Brubaker <br />President <br />~,~ ,_,_ <br />" ~pR 31 1995 <br />- .:-r:c> <br />LAMAR PUEBLO CANON CITY GUNNISON CRESTED BUTTE <br />
The URL can be used to link to this page
Your browser does not support the video tag.