Laserfiche WebLink
Stipulation No. 12 <br />THE PERMITTEE SHALL MAINTAIN RAPTOR BUFFER ZONES ESTABLISHED FOR THE MUNGER <br />CANYON MINE BY THE U.S.F.W.S FOLLOWING COMPLETION OF THE INITIAL RAPTOR SURVEY <br />CONDUCTED IN JULY 1983. NO SURFACE DISTURBANCES SHALL OCCUR WITHIN <br />ESTABLISHED BUFFER ZONES EXCEPT AS SPECIFICALLY AUTHORIZED BY CMLRD IN <br />CONSULTATION WITH THE U.S.F.W.S. AND C.D.O. W.. <br />Stipulation No. 14 <br />THE DIVISION REQUIRES SALT CREEK MINING TO COMPLETE APPROPRIATE WASTE SHEAR <br />STRENGTH TESTS AND TO SUBMIT THE RESULTS OF THOSE TESTS TO THE DIVISION FOR <br />REVIEW AND APPROVAL, IMMEDIATELY FOLLOWING THE AVAILABILITY OF REPRESENTATIVE <br />COAL PROCESSING WASTE REFUSE MATERIALS. IF SIGNIFICANT MATERIAL STRENGTH <br />VARIATION OCCURS BETWEEN THE ACTUAL TEST RESULTS AND THOSE VALUES ASSUMED IN <br />COMPLETING THE STABILITY ANALYSIS INCLUDED WITHIN THE AMENDED PERMIT REVISION <br />APPLICATION, THE DIVISION WILL REQUIRE SALT CREEK MINING TO COMPLETE AMENDED <br />STABILITY ANALYSIS AND DESIGN REVISION TO THE WASTE PILE PLAN. <br />Stipulation No. 15 <br />THE DIVISION DIRECTS SALT CREEK MINING COMPANY TO INSTALL SIGNS AT THE PERMIT <br />BOUNDARY AND AT STATION 67+00' ADJOINING THE HAUL ROAD. THESE SIGNS, LEGIBLE <br />FROM THE HAUL ROAD WHILE PROCEEDING TOWARD THE PORTAL BENCH SHALL READ: "ROAD <br />SLOPES SUBJECT TO ROCKFALL AND SLOPE FAILURE - PROCEED WITH CARE." <br />Stipulation No. 16 <br />PRIOR TO CONSTRUCTION OF THE HAUL ROAD, THE APPLICANT MUST PROPOSE THE <br />INSTALLATION OF ADDITIONAL ROAD SURFACE DRAINAGE CULVERTS TO MEET THE SPACING <br />REQUIREMENTS OF RULE 4.03.1(4)(e)(vi)(A). ALTERNATIVE SPECIFICATIONS MAY BE <br />UTILIZED UNDER THE PROVISIONS IN RULE 4.03.1(4)(e)(vi) IF THE APPLICANT <br />DEMONSTRATES THAT THESE SPECIFICATIONS WILL NOT RESULT IN AN INCREASE IN <br />EROSION. <br />Stipulation No. 17 <br />A PERFORMANCE BOND IN THE AMOUNT OF $691,804.00, PAYABLE TO THE STATE OF <br />COLORADO AND THE OFFICE OF SURFACE MINING, MUST BE FILED WITH THE DIVISION NO <br />LATER THAN 60 DAYS PRIOR TO INITIATING ANY DISTURBANCE ASSOCIATED WITH THE <br />PERMIT REVISION N0. 1 (CENTRAL FACILITIES) APPROVAL. NO DISTURBANCE SHALL <br />OCCUR UNTIL THE PERFORMANCE BOND HAS BEEN APPROVED AND ACCEPTED BY THE <br />DIVISION. <br />Stipulation No. 20 <br />PRIOR TO RECLAMATION OF THE MINE SITE, THE OPERATOR NEEDS TO SUBMIT, IN <br />WRITING, A REQUEST FROM THE SURFACE OWNER FOR RETENTION OF A PORTION OF THE <br />HAUL ROAD IF HAUL ROAD IS TO REMAIN AS A PERMANENT STRUCTURE. <br />Stipulation No. 21 <br />THE DIVISION MUST RECEIVE DOCUMENTATION OF SATISFACTORY RESOLUTION OF FIVE <br />AUDIT APPEALS FILED WITH THE OFFICE OF SURFACE MINING BETWEEN SEPTEMBER 1992 <br />-4- <br />