My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-04-17_GENERAL DOCUMENTS - M1985085
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1985085
>
1998-04-17_GENERAL DOCUMENTS - M1985085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2021 12:49:39 PM
Creation date
11/23/2007 7:03:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985085
IBM Index Class Name
General Documents
Doc Date
4/17/1998
Doc Name
RECEIPT
From
DMG
To
BOYCE LAND & CATTLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•Colorado Division of Minerals and Geology• <br /> ----------------------------------------- <br /> ESTIMATING FORM - BULLDOZER RIPPING <br /> Task #: 3 Prep. by: JD Task File Name: M085.3 <br /> ----------- -------- ------------- <br /> Date: 12/22/95 Permit #: M-85-085 Mine: Rancho Rosado Pit <br /> ---------- -------- -------------------------------- <br /> Permit Action: Final Reclamation <br /> ------------------------------------------------------------- <br /> Task Description: Rip 10 acre tract <br /> ------------------------------------------------------------- <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DBN Horsepower: 285 <br /> Blade Type: UNIVERSAL ---------- <br /> Attachment #1: ROPS Cab Shift Basis: 1/day <br /> Attachment #2: 3-shank ripper ---------- <br /> Cost/Hr Breakdown: Utilization % (code 690) <br /> ----------------- ownership = $46.68 N/A <br /> operating/overhaul - dozer = $51.93 100 <br /> -ripper = $6.68 100 <br /> operator = $22.95 N/A <br /> Total eqpt. unit cost/hr = $128.24 Total fleet cost/hr: $128.24 <br /> --------- --------- <br /> MATERIAL QUANTITIES <br /> Selected method Area <br /> Seismic Load Bank ------------- <br /> method: N/A N/A Factor N/A Volume N/A BCY <br /> Area ----------- ------- _-__------- <br /> method: 10.00 Acres Rip Depth: 1.00 Volume 16,133 BCY or CCY <br /> ----------- ------- ----------- <br /> Source of quantity takeoff: Calculation <br /> ---------------------------------------------------- <br /> Source of mat. load factor: N/A <br /> ---------------------------------------------------- <br /> HOURLY PRODUCTION <br /> Seismic Method - Seismic velocity of material: N/A feet/sec. <br /> -------------- - Unadjusted hourly production: N/A BCY or CCY/hr <br /> Area Method - Avg. ripping depth per pass: 1.00 feet <br /> ----------- - Avg. ripping width per pass: 7.08 feet <br /> - Avg, ripping length per pass: 300.00 feet <br /> - Avg. velocity of machine 88.00 feet/min. <br /> - Avg. machine maneuver time : 0.25 minutes <br /> - Hourly prod. per unit area . 0.800 acres/hr <br /> - Unadjusted hourly production: 1,289.94 BCY or CCY/hr <br /> Correction Factors - Unadjusted production = 1,289.94 BCY or CCY/hr <br /> ------------------ - Site altitude = 7,800 feet <br /> - Altitude adjustment = 1.00 (Cat tbl) <br /> - Job efficiency factor = 0.83 0 sh/day) <br /> - Net correction = 0.83 multiplier <br /> - Adjusted production = 1070.65 BCY or CCY/hr <br /> - Fleet production = 1070.65 BCY or CCY/hr <br /> JOB COST <br /> Fleet Size : 1 Dozer(s) Total Job Time: 15.07 Hours <br /> Unit Cost : $0.120 /LCY Total Job Cost: $1,932.43 <br /> -------- ----------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.