Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd Sheet 3 of 4 <br /> H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br /> Task Nod Task Description Cost (S) <br /> ----------------------------------—--------------I____________ <br /> ________________________________________________________________________ <br /> Subtotal (H): <br /> ------------ <br /> I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br /> Task Nod Task Description Cost (S) <br /> -------- -----------------------"------------------------- ----"""" <br /> ------------------------------------------------------------------------ <br /> Subtotal (1): <br /> J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br /> Task Nod Task Description Cost (S) <br /> 2 Replace Topsoil $1,718 <br /> ------------------------------------------------------------------------ <br /> Subtotal (J): $1,718 <br />