My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31580
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:38 PM
Creation date
11/23/2007 7:02:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
General Documents
Doc Date
10/7/2004
Doc Name
Reclamation & Permit Compliance Status
From
Seneca Coal Company
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. David Berry <br />Division of Minerals and Geology <br />Page S <br />package (scheduled for submittal by October 20, 2004 (TR-50). Finally, SCC completed <br />replacement of the W-24 series wells. The damaged wells will be abandoned in summer 2005. <br />YOAST <br />The Division noted the following items requiring attention during the September 23`~ meeting: <br />1. TR-25 (bond amount and slope stability [Pond 12 and Valora pit]) <br />SCC has completed a survey of open pit length and reported the results to the Division. The <br />Division in return has recalculated the bond. SCC will submit the additional bond by October <br />13, 2004. <br />2. Incousistencies between the reclamation maps and actual ground conditions. <br />SCC believes completion of the major reclamation projects previously discussed should <br />rectify the inconsistencies between the reclamation maps and actual on-the-ground <br />conditions. <br />SCC has also completed work, or is in the process of completing work on several other <br />reclamation issues identified in past inspections. Repair of the YPM-12 drainage channel and <br />Armand Draw has been completed. In addition, SCC is continuing to complete construction of <br />postmine drainage channels as azeas are final graded (see also TR-25). <br />SCC believes the previous discussion addresses all of the Divisions immediate concerns. If any <br />items have been overlooked, SCC would appreciate feedback, and will schedule as necessary to <br />address them. We reiterate our commitment to completing these tasks in as timely a fashion as <br />possible. <br />If you have any questions, or wish to discuss these matters further, please do not hesitate to <br />contact me (970) 276-5203. <br />Sincerely, <br />gg KitcheVn G <br />General Manager <br />cc: Sandra Brown, CDMG <br />Chuck Burggraf, Peabody Energy <br />Mark Yingling, Peabody Energy <br />
The URL can be used to link to this page
Your browser does not support the video tag.