My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31538
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:37 PM
Creation date
11/23/2007 7:01:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
5/12/2003
Doc Name
Proposed Decision & Findings of Compliance for PR7
From
Construct B-Seam Portals, Facility Benches, & Associated Structures
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XVI. Concurrent Surface and Underground Mining <br />This section does not apply to the Bowie No. 2 Mine permit application. <br />XVII. Operations on Alluvial Valley Floors <br />A. The Division has determined that an alluvial valley floor does not exist within the <br />affected area; however, an alluvial valley floor does exist in the adjacent azea. <br />Therefore, the following findings are made for the alluvial valley floor located <br />along the North Fork of the Gunnison River, downgradient from the Bowie No. 2 <br />Mine. <br />i. The Division fmds that activities proposed by the applicant will not <br />interrupt, discontinue, or preclude farming on the alluvial valley floors that <br />aze irrigated or naturally subirrigated (4.24.3(1)). <br />ii. The proposed activities will not materially damage the quantity or quality <br />of water in the surface or ground water systems described above (4.243(3) <br />and 2.06.8(5)(a)(ii). <br />iii. The proposed activities will comply with the requirements of the Act and <br />the Regulations, with respect to alluvial valley floors (2.06.8(5)(a)(iii)). <br />iv. Surface coal mining and reclamation operations will be conducted to <br />preserve the essential hydrologic functions of alluvial valley floors outside <br />the permit area throughout the minting and reclamation process (4.24.2). <br />B. An environmental monitoring system shall be installed, maintained, and operated <br />by the permittee to ensure the protection of all alluvial valley floors during <br />surface coal mining and reclamation operations and continued until all bonds are <br />released in accordance with Rule 4.24.4. <br />XVIII. Operations on Prime Farmland ' <br />The Bowie No. 2 Mine will not disturb or affect any prime farmland. <br />XIX. Mountaintop Removal <br />This section does not apply to the Bowie No. 2 Mine permit application. <br />XX. Operations on Steep Slopes <br />This section does not apply to the Bowie No. 2 Mine permit application document. The <br />Division does not propose to approve any variances pertaining to steep slope mining and <br />approximate original contour with this decision document. <br />35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.