Laserfiche WebLink
<br />-8- <br />STIPULATION N0. 8 <br />WITHIN 3 h10NTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL PREPARE AND <br />SUBMIT TO THE DIVISION FOR APPROVAL AN APPROPRIATE ANALYTICAL <br />DEMONSTRATION OF THE PROPOSED TOPOGRAPHY'S SLOPE STABILITY. "WORST <br />CASE" SITUATIONS FROM CROSS SECTIONS IN THE APPLICATION WOULD BE <br />ACCEPTABLE. THE REPORT PREPARED BY LAMBERT & ASSOCIATES INCLUDED IN THE <br />APPLICATION SHOULD PROVIDE THE NECESSARY MATERIAL STRENGTH PARAMETERS. <br />STIPULATION N0. 9 <br />WITHIN THREE MONTHS OF PERMIT ISSUANCE, AND PRIOR TO INITIATION OF <br />CONSTRUCTION OF THE PROPOSED WASTE PILE, THE PERMITTEE WILL AMEND THE <br />WASTE PILE CONSTRUCTION PLAN SO AS TO ELIMINATE DISCHARGE OR COLLECTION <br />PIPES AS COMPONENTS OF THE SUBDRAIN SYSTEM. <br />STIPULATION N0. 10 <br />WITHIN ONE MONTH OF PERMIT ISSUANCE THE PERMITTEE WILL SUBMIT A PLAN FOR <br />STORAGE AND DISPOSAL OF NON-COAL WASTE IN COMPLIANCE WITH RULES <br />2.05.4(2)(f) and 4.11.4 <br />STIPULATION No. 11 <br />WITHIN ONE MONTH OF PERMIT ISSUANCE, THE APPLICANT WILL COMMIT TO <br />IMPLEMENTATION OF THE SUBSIDENCE MONITORING PLAN AS RECOMMENDED BY THE <br />CONSULTANT'S REPORT CONTAINED WITHIN THE APPLICATION. <br />STIPULATION N0. 12 <br />THE PERMITTEE WILL SUBMIT TO THE DIVISION, WITHIN 120 DAYS OF PERMIT <br />ISSUANCE, A PLAN FOR SEALING PORTALS IN ACCORDANCE WITH 30 CFR 75.1711. <br />ACCEPTED AND AGREED: MINED LAND RECLAMATION DIVISION <br />By <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/JD <br />(Rev. 1/83) <br />Doc. No. 6670 <br />