My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31451
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:35 PM
Creation date
11/23/2007 7:00:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
2/19/1992
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Midterm Review <br />Orchard Valley and Orchard Valley West Mines <br />(C-81-038) <br />This document presents the results of the Division's Midterm Review of the <br />Cyprus Orchard Valley Coal Corporation, Orchard Valley and Orchard Valley West <br />Mines. This Midterm Review was conducted to fulfill the requirements of <br />Rules 2.08.3, 2.06.2(10), 2.06.3(4), 2.06.5(3), 2.06.7(5), and 3.02.2(4). <br />Rule 2.08.3 requires that the Division conduct a review of each permit issued, <br />prior to its midterm (2 1!2 years). Based on this review, for good cause <br />shown, the Division may require reasonable revisions or modifications of the <br />permit provisions to ensure compliance with the Act and Regulations. <br />Rules 2.06.2, 2.06.3, 2.06.5 and 2.06.7 require that experimental practices, <br />mountain top removal variances, variances from approximate original contour <br />(AOC), and variances from contemporaneous reclamation, respectively, be <br />reviewed by the Division where applicable during the midterm review. <br />Rule 3.02.2(4) requires that the Division review the amount of the bond and <br />the terms of acceptance of the bond every 2 1/2 years. <br />This midterm review consisted of a detailed review of the Orchard Valley and <br />Orchard Valley West Mine permit application and Findings Document to identify <br />any items that may have been overlooked during the initial review. The <br />Division also reviewed all subsequent revisions and stipulation responses to <br />ensure that all permit commitments and conditions were being followed. <br />Hydrologic monitoring data was reviewed in conjunction with the review of the <br />application to assess the adequacy of the monitoring plan and discussion of <br />hydrologic impacts. Problems and observations from past inspection reports <br />were also considered. <br />
The URL can be used to link to this page
Your browser does not support the video tag.