My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31413
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:34 PM
Creation date
11/23/2007 7:00:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
12/10/1992
Doc Name
Memo reviewing status of all stips
From
DMG
To
STIPULATION TRACKING FILE C-80-007
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 10 <br />THE DIVISION DIRECTS MOUNTAIN COAL COMPANY TO COMPLETE A THOROUGH <br />RECONNAISSANCE GEOLOGIC MAPPING OF THE PROPOSED UPPER WASTE PILE ACCESS <br />ROADWAY CORRIDOR. THE APPLICANT SHALL PLACE SPECIFIC EMPHASIS UPON THE <br />DETECTION OF SLOPE INSTABILITY EVIDENCE AND DRAINAGE CHARACTERISTICS OF <br />THE PROPOSED ROAD ALIGNMENT. <br />FURTHER, THE DIVISION DIRECTS MOUNTAIN COAL COMPANY, UTILIZING THE <br />RESULTS OF THE RECONNAISSANCE GEOLOGIC MAPPING, AND EARLIER ADJOINING <br />SURFACE FACILITY ROAD DESIGN STUDIES, IF APPROPRIATE, TO COMPLETE A <br />PRELIMINARY ACCESS ROAD CUT-SLOPE STABILIZATION AND DRAINAGE DESIGN. <br />THE MAPPING AND PRELIMINARY DESIGN SHALL BE APPROVED BY THE DIVISION, IN <br />WRITING, PRIOR TO ANY DISTURBANCE OF THE ACCESS ROAD CORRIDOR. <br />This stipulation has been incorporated into the permit on October 27, 1989. <br />It has been included on page 32 in the second part of Exhibit 50 in Volume 9. <br />STATUS: Terminated <br />Stipulation No. 11 <br />THE DIVISION DIRECTS MOUNTAIN COAL COMPANY TO CONSTRUCT THE UPPER WASTE <br />PILE ACCESS ROAD AS AN INITIAL PIONEER ROAD WITH MINIMIZED EXCAVATION. <br />UPON EXPOSURE OF THE EXCAVATED CUT-SLOPES OF THAT PIONEER ROADWAY, THE <br />OPERATOR SHALL COMPLETE A FINAL GEOTECHNICAL INVESTIGATION OF THE ACCESS <br />ROAD CORRIDOR. THIS GEOTECHNICAL INVESTIGATION SHALL BE COMPLETED BY <br />APPROPRIATELY QUALIFIED PROFESSIONAL GEOLOGICAL OR ENGINEERING <br />PERSONNEL. THE PURPOSE OF THIS FINAL INVESTIGATION SHALL BE TO VERIFY, <br />OR APPROPRIATELY AMEND, THE FINDINGS OF THE RECONNAISSANCE GEOLOGIC <br />MAPPING OF THE ROADWAY CORRIDOR. <br />FURTHER, MOUNTAIN COAL COMPANY, UTILIZING THE FINDINGS OF THE FINAL <br />GEOTECHNICAL INVESTIGATION, SHALL COMPLETE A FINAL ENGINEERED CUT-SLOPE <br />AND DRAINAGE DESIGN FOR THE UPPER WASTE PILE ACCESS ROAD. THIS FINAL <br />DESIGN SHALL BE APPROVED BY THE DIVISION, IN WRITING, AND THE <br />CONSTRUCTION COMPLETED IN ACCORDANCE WITH THAT DESIGN, PRIOR TO THE <br />TRANSPORTATION OF ANY WASTE MATERIAL ALONG THAT ACCESS ROAD. <br />This stipulation has been incorporated into the permit document on <br />October 27, 1989, and can be found on page 32 in the second part of Exhibit 50 <br />in Volume 9. <br />STATUS: Terminated <br />Stipulation No. 12 <br />THE DIVISION DIRECTS WECC TO COMPLETE THE INSTALLATION OF THE SUBSIDENCE <br />MONITORING NETWORK PRIOR TO THE INITIATION OF EXTRACTION OF COAL WITHIN <br />THE PANEL DESIGNATED IN APPENDIX A TO THE NOVEMBER 1984 PERMIT REVISION <br />APPLICATION ENTITLED "APPLICATION TO REVISE THE MINING AND RECLAMATION <br />PLAN FOR THE MT. GUNNISON N0. 1 UNDERGROUND MINE." THIS MONITORING <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.