Laserfiche WebLink
r <br />Stipulation No. 1 <br />NEITHER WEST ELK COAL COMPANY, NOR ANY SUCCEEDING OPERATOR OF THE WEST <br />ELK PROJECT'S COAL LEASES AND RESERVES WILL BE PERMITTED TO MINE COAL <br />WITHIN THE MINNESOTA CREEK BASIN, UNTIL DMG HAS RECEIVED A COPY OF AN <br />ADJUDICATED PLAN OF AUGMENTATION. <br />The B seam mine plan proposes mining under the Minnesota Creek Drainage. MCC <br />has provided an adjudicated plan of augmentation (Exhibit 52, Volume 11). <br />However, Item 54 on page 32 of the plan identifies it as being specific to <br />mining in the F seam. Therefore, the status of the stipulation will remain <br />"future." <br />STATUS: Future <br />Stipulation No. 2 <br />THE APPLICANT SHALL CONTINUE TO SUBMIT TO THE DIVISION AN ANNUAL REPORT <br />OF INFLOWS, DISCHARGES AND CONSUMPTION OF WATER WITHIN THE MINE. THIS <br />REPORT IS TO INCLUDE A MINE WORKINGS MAP SHOWING THE LOCATION AND <br />QUANTITY OF INFLOWS, A TABLE KEYED TO THE MINE MAP WHICH SHALL CONTAIN <br />THE SOURCE (I.E., FAULT, FRACTURES, ETC.>, QUANTITY, DURATION, AND <br />QUALITY (I.E. pH, ELECTRO-CONDUCTIVITY AND TEMPERATURE) OF ALL INFLOWS, A <br />TABLE CONTAINING RECORDS OF WATER DISCHARGED FROM THE MINE, CONSUMED IN <br />THE MINE, AND IMPORTED FOR USE WITHIN THE MINE, A MAP SHOWING CURRENT <br />WATER USES, A DISCUSSION OF THE WATER BALANCE WITHIN THE MINE, AND <br />FINALLY A PROJECTION OF HYDROLOGIC IMPACTS OF MINING IN THE UPCOMING <br />YEAR. THIS SHALL BE SUBMITTED NO LATER THAN APRIL 30 OF EACH YEAR, <br />INCLUDED WITH THE AHR. <br />All of the above information is contained within the permit with the exception <br />of water consumption information. If this information is incorporated into <br />the permit, the stipulation could be terminated. Until then, the stipulation <br />will remain active. <br />One minor change to the stipulation was made. With the approval of Technical <br />Revision No. 54, the due date of the Annual Hydrologic Report (AHR) was <br />changed to April 30 of each year. The above information is submitted with the <br />AHR. <br />STATUS: Active <br />Stipulation No. 3 <br />THE OPERATOR SHALL, UPON CLOSURE, INSTALL WATER-TIGHT SEALS WITHIN THE <br />MINE TO PREVENT GRAVITY DISCHARGE. THIS REQUIREMENT MAY BE WAIVED UPON <br />THE DIVISION'S APPROVAL OF A PLAN SUBMITTED BY THE OPERATOR. THIS PLAN <br />SHALL INCLUDE A DEMONSTRATION THAT THE WATER QUALITY OF THE DISCHARGE <br />FROM THE MINE WORKINGS WILL BE OF ACCEPTABLE QUALITY AND WILL REMAIN <br />ACCEPTABLE AFTER MINE CLOSURE. THIS SHALL INCLUDE CHEMICAL ANALYSIS AND <br />A PREDICTIVE MODEL THAT USES OXIDATION AND REDUCTION POTENTIAL TO <br />DETERMINE LONG-TERM WATER QUALITY OF MINE WATERS. ALSO, THE PLAN SHALL <br />INCLUDE THE CONSTRUCTION OF A SUITABLE CHANNEL FOR MINE DISCHARGE. <br />