Laserfiche WebLink
<br />Stipulation No. 40 <br />PRIOR TO DISTURBING THE AREA OF THE STORAGE PAD, MOUNTAIN COAL COMPANY <br />MUST SUBMIT CALCULATIONS TO SHOW THAT THE SEDIMENT POND RECEIVING THE <br />RUN-OFF FROM THE STORAGE PAD IS SUFFICIENTLY SIZED TO HANDLE THE <br />CALCULATED VOLUME OF WATER. <br />This stipulation was added to the approval of Technical Revision 58. <br />STATUS: Complied with on November 25, 1991 <br />Stipulation No. 41 <br />PRIOR TO THE IMPORTATION OF FILL MATERIAL TO CONSTRUCT THE COAL STACKING <br />TUBE PAD, MOUNTAIN COAL MUST SUBMIT BOND CALCULATIONS AND UPDATE THE <br />RECLAMATION PLAN FOR THE REMOVAL OF THE FILL MATERIAL. THE SOURCE OF THE <br />FILL MATERIAL MUST BE IDENTIFIED. IF GOB IS TO BE USED, THIS MUST BE <br />PROPOSED AS A TECHNICAL REVISION AND BE SUPPORTED WITH DESIGNS THAT MEET <br />THE DIVISION'S PERFORMANCE STANDARDS FOR COAL WASTE BANKS. PLANS MUST BE <br />CERTIFIED BY A QUALIFIED ENGINEER. <br />This stipulation was imposed as part of Technical Revision 58. <br />STATUS: Complied with on November 25, 1991 <br />Stipulation No. 42 <br />THE INFORMATION SUBMITTED WITH THE TECHNICAL REVISION AND AS PART OF <br />STIPULATION RESPONSES MUST BE INCORPORATED INTO THE NEW REORGANIZED <br />PERMIT APPLICATION. STIPULATION RESPONSES MUST BE SUBMITTED AS MINOR <br />REVISIONS OR, IF GOB IS TO BE USED AS FILL, THAT PORTION MUST BE <br />SUBMITTED AS A TECHNICAL REVISION. <br />This stipulation was imposed as part of Technical Revision 58. <br />STATUS: Active <br />Stipulation No. 43 <br />MUST SUBMIT "AS-BUILT" DESIGNS FOR ALL STRUCTURES AT THE WEST ELK MINE <br />SITE, INCLUDING, BUT NOT LIMITED T0: ALL SURFACE FACILITIES, DEWATERING <br />SYSTEM, PORTAL BENCH AND PORTAL STRUCTURES, WATER TREATMENT PLANT, <br />STORAGE TANKS, AND WASTE WATER PLANT BY DECEMBER 30, 1992. <br />This stipulation was added to the approval of Technical Revision 59. <br />STATUS: Active <br />-13- <br />