Laserfiche WebLink
iii iiiiuii~iii~i~ <br />DEPARTMENT OF NATURAL RESOURCES <br />Dared H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />Richard D. Lamm <br />Governor <br />DATE: April 30, 1985 <br />T0: Joe Oliver <br />FROM: Jim Pendleton ~.~'y""`-~ <br />RE: Eastside's R ponse Stipulation No. 8 & No. 9, Permit No. C-84-063 <br />Pursuant to your request I have reviewed Eastside's submittals made in <br />response to Stipulation No. 8 & No. 9, placed upon approval of their Permit <br />No. C-84-063. Stipulation No. 8 required the submittal of a stability <br />analysis of the proposed post-mining configuration within the mine surface <br />facility area. The operator's submittal has satisfied the requirements of <br />Stipulation No. 8. Stipulation No. 9 required an amendment to the subdrain to <br />be constructed beneath the waste pile. As required, the operator has amended <br />the pipe drain outfall system, replacing it with a gravel drain. This <br />redesign satisfies the requirements of Stipulation No. 9. <br />/ph <br />Doc. No. 9933 <br />cc: Brian Munson <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />