Laserfiche WebLink
~5 <br />•, <br />f...' <br />XXVI <br />Demonstration that Surface Coal Mining and Reclamation <br />be Feasibly Accomplishe - Fu a 2. .6 2 b <br />Based on information contained in the application and with the resolution of <br />the stipulations in this document, the Division finds that surface coal mining <br />and reclamation can be feasibly accomplished at the Coal Gulch Mine. <br />Information demonstrating the feasibility of the operation and reclamation <br />plan can be found in Section 2.04 and 2.05 of the application. <br />The proposed operation is in compliance with this section. <br />XXVII. Compatibility with Anticipated Adjacent Operations - <br />Rule 2.07.6 I <br />At this time, there are no existing or anticipated coal mining operations <br />adjacent to the Coal Gulch Mine. <br />The proposed operation is in compliance with this section. <br />XXVIII. Reclamation Fees Re wired by 30 CFR, Cha ter VII, Sub-chapter R, <br />Rule 2.07.6 (2 (o <br />As this is a new mine, no orphan land fees have been paid as yet. Peerless <br />Resources does not operate any other coal mines which would pay fees. <br />The proposed operation is in compliance with the requirements of this section. <br />tions can <br />/mis <br />0912E <br />