Laserfiche WebLink
:. <br />RECLAMATION COST SUMMARY cone d sheet 3 of 9 <br />N . EARTHWORK - STREAI4 CHANNEL RECONSTRUCTION <br />Task No.~ Task Descripc ion <br />___________ ~ Cost <br />_____I_______ 151 <br />___ <br />Subtotal (H): <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Desc ripcion ~ Cost I$) <br />Subtotal (I): <br />J. EARTHWORK - TOPSOT L/SUBSOIL REPLACEMENT <br />Task No.~ Task Descri pion <br />6 ~ Replace Topsorl on 2h:ly slopes <br />'/ ~ Replace Topsoil around Facility Area <br />Cost ($) <br />$14,198 <br />$28,483 <br />Subtotal IJ): 542.681 <br />