My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31354
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:33 PM
Creation date
11/23/2007 6:59:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
General Documents
Doc Date
7/18/1983
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-~- <br />Description of the Operations and Reclamation Plan <br />Facilities at the Terror Creek Load-out will consist of raw and crushed <br />coal stockpiles, crushing and screening facilities and a train load-out <br />facility. The anticipated annual coal tonnage to be handled 1s 500,000 <br />tons. <br />Drainage and sedimentation control will consist of a diversion ditch to <br />direct undisturbed irrigation drainage and, storm runoff around the site, <br />a berm to prevent spillage of coal over the bench, and a sediment pond to <br />retain disturbed drainage and allow for NPDES compliance prior to <br />discharge. Crushing, conveying and load-out operations will be equipped <br />with a water spray system to control dust. Interim revegetation of road <br />cuts, berms, and the topsoil stockpile will further minimize wind and <br />water erosion. <br />Coal handling operations will consist of raw coal from haulage trucks or <br />the raw coal stockpile being dumped into an enclosed hopper and fed to <br />appropriate screens for size separation. The product coal will either be <br />loaded directly into rail cars or placed in an appropriate stockpile far <br />later loading. Product coal will Include lump, stoker, and fines. <br />Final reclamation will entail site grading to restore the approximate <br />original contour, topsoil replacement, and seeding with adapted pasture <br />grasses. Measures will be taken to insure that the water holding <br />capacity and drainage characteristics of the reclaimed slope are <br />comparable to pre-mining conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.