Laserfiche WebLink
<br />~, <br />i <br />Exhibit B <br />(continued) <br />Permit Stipulations and Their Status <br />Number Stipulation <br />13 A performance band in the amount of <br />$2,646,300.00 payable to the State of Colorado <br />and the Office of Surface Mining, must be filed <br />with the Division within thirty (30) days of <br />issuance of the proposed decision. <br />14 Peabody Coal Company will submit revised <br />maps and pages for MR-O8, realignment of <br />Haul Road A between stations 64+00 and 81+00, <br />by November 20, 1989. The new alignment will <br />shorten Haul Road A slightly, increase grade <br />from approximately 6~ to 7S, and eliminate two <br />hairpin turns. Submittal should include <br />revised Table 12-4 (culvert sizing), revised <br />Exhibits 7-10, 12-1, 12-8A3, 12-8A4, and any <br />other pages or exhibits pertaining to this <br />stretch of Haul Road A. <br />15 Peabody Coal Company must submit bonding <br />information to cover costs of haul road <br />surface material removal, initial cast spoil <br />material replacement, and topsoil replacement <br />by December 22, 1989. This information must <br />cover, at a minimum, all specific tasks which <br />were addressed in TR 5, subsequent Division <br />adequacy review letters, and Peabody responses <br />to those 1 etters. <br />Status <br />Resolved, <br />10/3/85 <br />Resolved, <br />12/ 14/ 89 <br />Resolved, <br />4/30/90 <br />(see TR 7) <br />0736G <br />