My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31326
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:32 PM
Creation date
11/23/2007 6:58:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
General Documents
Doc Date
6/6/1997
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE FOR RN3
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER OR ENGINEERING GEOLOGIST. A LETTER OF CERTIFICATION <br />CONTAINING THE RESULTS MUST BE SUBMITTED TO THE DNISION WTI'HIN <br />TWO WEEKS FOLLOWING THE INSPECTIONS. <br />The numbers of these stipulations have been changed since issuance of the original permit. The <br />contents of the stipulations remains the same. Stipulation 1 on the original permit and <br />Stipulation 5 on the 1986 permit renewal are now Stipulations 3, and 17, respectively. <br />The following stipulation are placed upon the decision to renew the Seneca II Mine permit for a <br />third five year term: <br />STIPULATION 31 <br />THE PERMTI' RENEWAL OF THE SENECA II MINE IS CONDITIONED UPON THE <br />RESOLUTION OF KENTUCKY CNII. PENALTY VIOLATIONS AND BOND <br />FORFEITURE ASSOCIATED WITH PERMTI' NUMBER 8980140. PROOF OF <br />RESOLUTION SHOULD BE SUBMITTED TO DMG AS SOON AS 11' BECOMES <br />AVAII.ABLE. <br />STIPULATION 32 <br />APPROVAL OF THE POSTMINING ROAD RETENTION, DEPICTED ON EXHIBTI' <br />12-9, IS CONDITIONED ON THE SUBMITTAL OF A DETAII.ED RECLAMATION <br />PLAN IN ACCORDANCE WTI'H RULE 2.05.4(2), AND A REQUEST FROM THE <br />LANDOWNER IN WRTI'ING THAT THE ROAD IS TO BE LEFT OPEN FOR <br />FURTHER USE. <br />STIPULATION 33 <br />PRIOR TO PERMANENT CHANNEL R CONSTRUCTION ON ALL RECLAIMED <br />AREAS AT THE SENECA II MINE, THE OPERATOR SHALL SUBMIT DESIGNS <br />ON THE CHANNELS IN ACCORDANCE WITH RULES 4.05.3 AND 4.05.4. <br />STIPULATION 34 <br />BY AUGUST 15, 1997, SENECA COAL COMPANY SHALL PROVIDE THE <br />DNISION WITH A MITIGATION PLAN IN THE FORM OF A TECHNICAL <br />REVISION ADDRESSING THE TOPSOII. DEFICIT AT THE SENECA II MINE. NO <br />TOPSOII. SHALL BE REPLACED ON THE RECLAIlVIED AREAS UNTIL THE <br />TOPSOIL MITIGATION PLAN IS APPROVED BY THE DNISION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.