Laserfiche WebLink
N. Topsoil <br />Information regazding topsoil may be found in Volume 7, Tab 9 of the original permit <br />application package. <br />Information in the original findings document for Seneca II Mine (August 10, 1981) <br />identified two concerns; heavy clay concentration in certain soil types and, limited soil <br />salvaging in steep slope areas. To mitigate the heavy clay concentration, Seneca Coal <br />Company proposed stripping topsoil in single lifts to mix different soil orders and to <br />dilute the heary clay concentration. This salvaged topsoil is either taken directly to <br />regraded spoils or to a topsoil stockpile. Seneca Coal Company proposes to continue this <br />practice except, when feasible, topsoil will be salvaged in two lifs and redistributed <br />directly on regraded areas. This practice promotes the natural regeneration of existing <br />species. <br />Steep slopes (40-60%) are encountered within the Seneca II Mine permit azea. A <br />stipulation requiring approval of a varrr._ice from topsoil salvaging on those areas was <br />placed on the original permit approval. A request for variance from topsoil salvaging of <br />some steep slope areas as identified on Exhibit 9-3, was submitted as part of the Wolf <br />Creek Permit Revision. This variance request for the Wolf Creek Permit Revision Area <br />was approved by the Division on September 25, 1984. <br />Seneca Coal Company was originally (1981) approved to return approximately 1.4 feet <br />(15-18 inches) of highly suitable topsoil to regraded areas. As addressed in the Wolf <br />Creek Permit Revision and approved by the Division, the depth of topsoil replacement <br />was reduced to approximately 12.2 inches. To verify compliance of this topsoil <br />replacement depth, Seneca Coal Company committed to a final topsoil balance survey for <br />the duration of mining. To verify compliance, Seneca Coal Company has expanded the <br />quality control program as addressed on pages 9-40 and 9-41 of the revised permit <br />document with a commitment to annual topsoil balance surveys. <br />As part of the 1994 Midterm Review, Seneca incorporated a current topsoil balance into <br />the permit. All of the existing topsoil piles were resurveyed in the Spring of 1996. <br />Approximately 379.7 acre-feet of soil was stockpiled at the Seneca II Mine as of May 15, <br />1996. The disturbance area requiring soil replacement totals 607.4 acres. It is estimated <br />that 0.5 feet of suitable soil is availably .o be replaced on the disturbed area. The soil <br />replacement thickness for the remaining permit term is approved to be 12.2 inches. <br />Seneca has failed to provide any additional information to substantiate the claim of <br />suitability of 0.5 feet of topsoil replacement. Due to the lack of supporting <br />documentation on 0.5 feet of topsoil replacement, the following stipulation is warranted; <br />35 <br />