Laserfiche WebLink
• • <br />bonding scenario. Furthermore, he granted EFCI permission to <br />utilize material from the highwall for non-toxic cover if it would <br />allow EFCI to meet their statutory requirements for cover material. <br />The Division will pursue reclamation of the Section 24 land within <br />the G.E. C. permit in a timely manner. The Division will send plans <br />previously prepared by the Division to Dr. Corley on Tuesday, <br />September 3, 1991. <br />Please call if your understanding of the commitments made at this <br />meeting differed substantially from those presented above. The <br />Division is optimistic that all parties will abide by their <br />commitments and appreciates all of the energy which has gone into <br />the permitting of this area. <br />Sincerely, <br />Catherine W. Begej <br />Reclamation Specialist <br />cc enae_ _~- <br />D. Berry <br />F. Johnson <br />R. Munson <br />R. Acres <br />CWB.991 <br />