Laserfiche WebLink
i <br />• • <br />figure we used 500 feet as the maximum haul distance. If you <br />refer to the most recent annual report you will see that <br />there are soil stockpiles located along the southern boundary <br />of the affected lands. Because there are no soil stockpiles <br />on the northern property line a more realistic haul distance <br />would be 1000 feet maximum this splits the distances that <br />we have both originally used. The revised reclamation costs <br />attached reflect a dozer cost of $0.31/yd and a scraper cost <br />of $0.65/yd as figures acceptable according to Doc. No. 1457 <br />If you have any further question pleas call. If at all possible <br />let's try to make this a no problem agenda item. <br />Sincerely, <br />'"- "` <br />Stevan L. O'Brian <br />Vice President <br />Enclosure <br />