Laserfiche WebLink
-3- <br />Revisions Required <br />Le al, Financial, Com liance Information - The Division finds that <br />t~f7Towing r~ion is inaccurate and needs to be updated to <br />reflect changes that have occurred over the past 3 years. <br />Specifically: <br />a. Kaiser Coal Company has acquired the Chimney Rock Coal Mine. <br />Appropriate legal, financial, and compliance information should <br />be provided for incorporation into the Chimney Rock Permit <br />Document, and a succession of operators applied for under Rule <br />2.08.6. <br />b. Kaiser Coal Company should update the compliance information for <br />the Chimney Rock Coai Mine. <br />c. Kaiser Coal Company needs to revise and update all copies of <br />their permit application on file with the Division to reflect all <br />submittals received by the Division after permit issuance; <br />including but not limited to revisions, responses to <br />stipulations, and revisions required by this 2 1/2 year review. <br />This material will include, but not be limited to text, maps, <br />figures and tables, and should be of a format which faci]itates <br />incorporation into the permit application as replacement pages, <br />appendicies, and replacement maps. <br />All material should be noted as revised and dated, and <br />incorporated by Kaiser Coal Company into the permit application <br />document. <br />2. Reclamation Plan - Kaiser Coal Company should provide the Division <br />wit an up ate tentative time table for the reclamation of the <br />Chimney Rock Mine. <br />Topsoil - To properly address concerns regarding topsoil, the <br />operator should provide to the Division calculations which show how <br />much topsoil is needed to finish reclaiming the disturbed area at the <br />mine site. The operator should also provide the Division with <br />calculations which show how much topsoil is currently available in <br />stockpiles at the mine site. <br />