Laserfiche WebLink
..ono. 3 ~o.u..~.a <br />5. The posts in the basement not provided with separate footings. <br />6. Failure to provide a base raised above the basement Floor line <br />for the setting of wooden posts. <br />7. Not enough cement used in fhe concrete. <br />8. Dirty sand or gravel used in the concrete. <br />9. Fail~•re fo protect bec;r.is and sills from rotting through dampness. <br />10. Setting Floor joists one end on <br />masonry and the other on wood. <br />11. 1^Jooden beams used to support ' <br />masonry over openin~~s. <br />12. Mortar, plaster or concrete work <br />allowed to freeze before setting. <br />13. Braces omitted in wooden walls. <br />14. Sheathing omitted in wooden <br />walls (except in "back-plastered" <br />construction). <br />15. Drainage water from roof not <br />carried away from the foundations. <br />16. Floor joists too light. <br />17. Floor joists not bridged. <br />18. Supporting posts too small. <br />19. Cross beams too light. <br />20. Subflooring omitted. <br />27 <br />