August Monthly Report - 2002 <br />Page 4 <br />American Tunnel Bulkhead No.2 <br />A submittal was sent to DMG showing that the equilibrium and water quality stipulation <br />had been met. The bulkhead pressure remained at 175 psi. DMG concurred with the <br />assessment and the American Tunnel Bulkhead No.2 valve was permanently grouted on <br />August 29, 2002. Setup for construction of the American Tunnel No.3 Bulkhead will start <br />in September. <br />If you have any questions on this report, please contact me. <br />I certify under penalty of law that I have personally examined and am familiar with the <br />information submitted herein; and based on my inquiry ofthose individuals immediately <br />responsible for obtaining the information, I believe the submitted information is true, <br />accurate and complete. I am aware that there are significant penalties for submitting false <br />information, including the possibility of fine and imprisonment. See 15 U. S.C. Section <br />1001 and 33 U.S.C. Section 1319. <br />Sincerely, <br />~_~ ~~ <br />Larry Perino <br />Reclamation Manager <br />cc: EPA -Bruce Kent (8P-W-T) <br />DMG -Wally Erickson <br />Allen Sorenson <br />