Laserfiche WebLink
<br />' CHAPTERFOUR <br />1 <br /> <br />1 <br /> <br /> <br />1 <br />1 <br /> <br />1 <br /> <br /> <br /> <br /> <br />I , <br /> <br />Environmental Consequences <br />Comparison to PSD Class II Increments <br />The PSD regulations have established most azeas of the United States as Class II Areas. An <br />increment level has been established to limit the amount of degradation to the existing air quality <br />in Class II azeas. The Class II increments aze presented as follows: <br /> PMIp !: PM10 ' NOZ <br /> ;:::: . <br />;24ttaor .::::.:.::.:. <br />:::.:.::.. Annual.:;':':: ; ;:. ; <br />: ' : ' Artuiua:";':.:: <br /> <br />PSD Class II Increment 30 17 25 <br />Concentration <br />Emissions of NOZ and PM~o from the Piceance initial processing facility and the Parachute <br />processing facility were modeled and compazed to the established increments for Class II. In <br />addition, a cumulative analysis was performed using all the increment consuming sources <br />identiFed by the CDPHE. Tables 4.5-6 and 4.5-7, present summaries of the cumulative Class II <br />increment analyses for the Piceance and Parachute Sites, respectively. Impacts from both the <br />Piceance and Parachute Sites are less than the Class II significant impact levels. <br />Piceance Site <br />TABLE 4.5-6 <br />SUMMARY OF CUMULATIVE CLASS II INCREMENT ANALYSIS <br />FOR THE PICEANCE SITE <br /> <br />.......:..::..:..:.:...:.:. <br />o .utari.:.:ammeter : :.::::::::::: ;:.PM :.:::::: <br />.::::.... <br />:.::::::::24tiour.;;:::::: .:::::.:::PM <br /> <br /> <br />anus ..:..::.:::. <br />.:::::::::• ;;1V0...,.::::::::: <br /> <br /> <br />:::::.:.:: uua.:::.:'.:: <br />Maximum Piceance-only <br />Increment Concentration (µg/m') 20.6 7.1 i4._ <br />Percent of Class II Increment (%) 68.7 41.8 57.0 <br />Maximum Cumulative Increment <br />Concentration (µg/m') 29.1 7.9 17.8 <br />Percent of Class II Increment (%) 97.0 46.5 71.2 <br />Source: RTP I998a <br />Meteorology and Air Quality 4-27 <br />