Laserfiche WebLink
DEPANTMENT OF tN ATURAL HESOUNC ES" ~N r'fv l~'I, r'I II I I II I II III IIII III <br />D. Monte Pascoe, Executive Director <br />M1NED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 839-3567 <br />David C. Shelton <br />January 23, 1981 Director <br />Mr. Dale Fenwick <br />GEX Colorado Inc. <br />P,0. Box W <br />Palisade, Colorado 81526 <br />Re: Roadside Refuse Pile - Our File No. 77-442 <br />Dear Dale: <br />I was pleased to see the progress that was made on grading the Roadside <br />refuse pile during my inspection of January 14, 1981. As was explained, <br />equipment breakdowns resulted in your not being able to meet the deadline <br />of January 14, 1981 to complete the rough grading of the Roadside refuse <br />pile. Therefore, the Division is granting an extension to January 28, 1981 <br />to complete the rough grading. This 14 day extension was agreed on follow- <br />ing a discussion with Earl Wallum and yourself, as a practicle time for <br />completion. We also agreed that within 30-45 days, which would be by <br />February 27, 1981, the east edge of the pile along tVte access road to the <br />area above the mine would be cleaned up and any fine-tuning of the grading <br />will be accomplished. <br />Again, I would like to emphasize that Mined Land Reclamation considers <br />this to be a serious problem and your cooperation in meeting these deadlines <br />is appreciated. <br />If you have any questions or comments on this, please give me a call. <br />S'ncerel , <br />Y <br />Ji Herron <br />Reclamation Specialist <br />JH:mab <br />