Laserfiche WebLink
<br />TRINIDAD BASIN MINE <br />MVC-MINES-348 <br />BID SCHEDULE <br />AMENDMENT #1 <br /> <br />Task <br />~ Description <br />Otv <br />Unit Unit <br />Price <br />Amount <br />1 . Mobilization/Demobilization, per specs 1 Job N/A S O. <br />2. Linden Avenue Lodaout coal removal and <br />reclamation, per specs 1 Job NIA ,~ <br />5. 0 0 0. 0 0 <br />3.A. Section 15 stream realignment, per specs. <br />Upper stream realignment, no riprap, <br />Drawing 2A. 350 LF Sri. 90 SS! S/5.0 <br />3.B. Sec. 15 stream realignment with riprap, <br />Drawing 26 200 LF S ~~ • I 0 S / 5~ ~ <br />4. Pond 15-P10 removal, per specs, per <br />specs 1 Job N/A S~ ~n0.00 <br />5. Reconstruction of Pond 22-P10, per specs 1 Job N/A S 5 O. 00 <br />6. Ditch repair, culvert installation and rock <br />swale construction, per specs 1 Job N/A S, 00.00 <br />7. Spillway repair and clean-out of Pond 15- <br />P20, ditch removal, per specs 1 Job N/A S3. .0 <br />8. Spillway removal Pond 22-P4, per specs 1 Job N/A S~ti DD• O D <br />9. Ditch and gully repair, per specs 1 Job N1A S 0 <br />10. Spillway repair Ponds 15-P11 and 12-P12, <br />per specs 1 Job N/A S~.5n0•DD <br />1 1 . Riser modification, Ponds 22-P5, 22-Pfi, <br />and 22-P10, per specs 1 Job N/A S ,3 ~ O.0 O <br />12. Trailer removal, per specs 1 Job N/A Sa o0. <br />13. Revegetation, per specs 1 Job N/A S o.OD <br />14. Reforestation, per specs 1 Job N/A S ,OD <br /> GRAND TOTAL ----------------------------------------------------------------~ S 58 <br />(Enter here and on Invitation and Bid sheet) <br />THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br />Page 1 of 1 Page <br />