My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31114
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:29 PM
Creation date
11/23/2007 6:52:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
9/30/1981
Doc Name
Stip 35 letter
From
ARCO COAL CO
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~; <br />-,. <br />~% <br />ARCO Coal Comp <br />Perm ils an mplia nce Group <br />555 Seventeenth Street <br />Mailing Address: Box 5300 <br />Denver, Colorado 00217 <br />Telephone 303 575 7500 <br />~~I ~II~I~II~~~~~~~~ <br />(~ ~ ` n 999 <br />CEP ~ u 1981 <br />September 30, 1981 <br />Mr. Tom Cillis <br />Reclamation Specialist <br />Mined Land Reclamation Division <br />State of Colorado <br />1313 Sherman Street <br />Denver, Colorado 80202 <br />Dear Mr. Gillis: <br />In regard to Stipulation PIo. `~ "Prior to placement of <br />drainage culverts, ARCO Coal Company shall submit to the Division by <br />September 30, 1981 a revised design for .Pipes 10 and 11 which provides <br />sufficient flow capacity to prevent ditch overtopping". <br />The following explanation will clear up the concern over these culverts. <br />Pipes 10 and 11 are shown on Drawings 9 and 7 of Exhibit 3.l.l.D. The <br />invert elevation of elevation of this culvert is 6121.00 and is located <br />at Station 8 + 32 of the access road. Drawing N14 shows that the centerline <br />of the road is at elevation 6124.9. It would appear that there is only <br />48" of freeboard which conflicts with Table 7 of Exhibit 3.3.1.A which <br />requires 61" of freeboard. <br />It is important to note, however, that this portion of the road is on a <br />curve and is therefore "superelevated". Since the centerline of the road <br />is 61211.9 and has a 3o cross slope normally, the elevation of the northermost <br />shoulder is 6124.5. To determine the elevation of the southernmost shoulder <br />of the road at that station, one must determine a factor "E". <br />E = 0.0075 x Degree of Curvature <br />= 0.0075 x 8.8067° <br />= 0.066 <br />The elevation of the superelevate shoulder is determined as follows: <br />Elevation of South Shoulder = Elevation of north shoulder <br />plus E x Width of Road <br />= 6124.5 + (0.066)(24') <br />= 6124.5 + 1.584 <br />= 6126.1 Feet <br />•RCO Coel Company ie • Dirialpn of •Venl¢Rlc nlle lO Company <br /> <br />fJINED LAND RECLAMATION <br />Colo. Dept. of Natural Resources <br />1`'~ <br />h~~' v S P' <br />35 which reads <br />,~aco.a:or <br />
The URL can be used to link to this page
Your browser does not support the video tag.