My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31084
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:28 PM
Creation date
11/23/2007 6:52:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
General Documents
Doc Date
5/9/2001
Doc Name
MEMO TO FILE VARIOUS MATTERS HENDERSON MILL CLIMAX MOLYBDENUM CO PN M-1977-342
From
DMG
To
FILE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~' IIIIIIIIIIIIIIIIIII • <br />999 <br />STATE • <br />OF <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Nawral Resources <br />1713 Sherman St., Room 215 <br />Denver, Colorado 80203 DIVISION O F <br />Phone: 1303) 866-3567 MINERAL 5 <br />FAX: (3031 832-B106 MEMO TO FILE & <br /> GEOLOGY <br /> RECLAMATION <br /> MI NING•SAFETY <br />Date: 5/9/01 4:26:50 PM <br /> Bill Owrns <br /> / / t _ Governor <br />S ecialisL Allen Sorenson Si ned: <br />P g ereg E. walcner <br />Executive Director <br /> Michael B. Long <br /> Division Director <br />SubjeeUOpera[or/Operation/File No. Various Matters, Henderson Mill, <br />Climax Molybdenufn Company. Permit No. M-1977-342 <br />Type of Interaction: Meeting Phone Other <br />Person(s) contacted and affiliation: Erich Bower, Environmental Coordinator, Henderson Mill <br />303/569-3321 ext. 2214 <br />Summary and Resolution of Interaction: Telephone discussion with Erich Bower on the following <br />matters: <br />1. Henderson is compiling a technical revision for submittal to install a ground water interception well field <br />below the tailing impoundment. This type of facility is considered a "permit condi[iorl protective of <br />ground water" under Rule 3.1.7, and does not require that points of compliance and numeric protection <br />levels be addressed in the TR application. <br />2. The crusher at the mill site is under demolition. Ore residue, or dead bed, accumulated in the crusher pit <br />is compacted and cemented such [hat it cannot be excavated without blasting. The Operator needs to know <br />what [he standard for dead bed removal will be. The dead bed is a potential source for acid rock drainage, <br />but since the crusher pit will be backfilled and capped, is lined with a concrete foundation. and is located <br />out of drainage ways and above the water table, de minimus amounts of dead bed remaining; in the pit will <br />not cause ARD. The standard for removing the material is [o apply the best reasonable effort using <br />excavators and possibly some degree of hand mucking, but the pit does clot need to rinsed with high <br />pressure water and vacummed. The Operator was notified that [he Division must inspect [he crusher pit <br />prior to backfilling. <br />3. The 3-Dam seepwater project is being completed. The old 3-Dam pump station has remained operational <br />as a backup system over the past winter. The Division, through the phone conversation and by this memo, <br />provided the go-ahead to remove the 3-Dam pump station concurrently with finalization of the seepwater <br />project. <br />cc: Erich Bower, vinfncsimile <br />Carl Mount, DMG <br />c:\windows\personal\henders ~n mt( various doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.