Laserfiche WebLink
i <br />L <br />Dec. 8 '92 13 45 KONICA FAX 275 P. 1 <br />e <br />DRAFT <br />s~r$aRlxa coxi~ITTSS ~-asxDa <br />nscaxssa is, isss <br />a:oo A.x. <br />8:00 a.m. I. Safety-Environmental Update Dave ~[ough <br /> a. Permit Revision <br /> b. Waste oil Heaters <br /> C. Column Lsach Study <br /> d. Safety Statistics <br />8:3o a.m. II. Engineering update Brian Woodward <br /> a. Mina Planning-8hort Range Darold Koch <br /> b. Fives Year Mina Plan <br /> c. Incremental Cost Study-3.7 to 6.5 MT <br /> d. Potential Amax Coal Aasignmant <br /> s. Dry Fork Lake Updat• <br /> f. Anderson Coal Recovery <br />9:45 a.m. III. Opsrations Update Jim Sarvay <br /> a. Productivity <br /> b, Equlpmsnt (Major Rapaira) <br /> c. Productivity Enhnncemsnta <br />10:30 a.m. iV. Personnel Rod Malf <br />10:45 a.m. V. Accounting-Administration Update Darold Koch <br />a. Status of 1992 Operating costa <br />b. Potential Wyoming Tax Legislation <br />11:15 a.m. VI. Marion Shovel Contract Update Gordon Paters <br />11:30 a.m. VII. Marketing Analysis Update Banton Kelly <br />11:45 a.m. VIII. LUNCH (at DFCC) <br />WGP/hjg <br />c: Raja Upadhyay <br />Don De rdorff <br />Banton Kelly <br />Mike Arne <br />Lyle Gruenich <br />Gene Fuher <br />Rod Wolf <br />DFCC Senior staff <br />,~ <br />