Laserfiche WebLink
Findings of the Colorado Division of Minerals and Geology {tc \Il "Findings of the Cobrxb <br />Division of Minerals and Geology}for the Chimney Rock Mine <br />Explanation of Findings <br />Pursuant to Rule 2.07.6(2) of the Regulations of the Colorado Mined Land Reclamation Boazd for <br />Coal Mining, and the approved state program, the Division of Minerals and Geology or the Boazd <br />must make specific written findings prior to issuance of a permit, permit renewal or permit revision. <br />These findings are based on information made available to the Division that demonstrates that the <br />applicant will be able to operate incompliance with the Colorado Surface Coal Mining Reclamation <br />Act and the Regulations promulgated pursuant to the Act. <br />The findings in the following sections required by Rule 2.07.6(2) aze listed in accordance with that <br />Rule. The findings and specific approvals required pursuant to Rule 2.07.6(2)(m) are listed in <br />accordance with Rule 4 and are organized under subject or discipline subtitles. <br />This fmdings document is updated upon permit renewal, which occurs every five yeazs for most <br />mines. This is the renewal findings document for the Chimney Rock Mine, which has a 5-year <br />permit term. The following findings were reevaluated and updated if necessary to reflect changes <br />which have occurred during the past permit term. Any stipulations from the original permit and <br />fmdings document or subsequent revisions that have been totally resolved to the satisfaction of the <br />Division, have been removed from this document. <br />Section A -Rule 2.07.6{tc \12 "Section A -Rule 2.07.6} <br />1. The permit application is accurate and complete. All requirements of the Act and these rules <br />have been complied with (2.07.6(2)(a)). <br />2. Based on information contained in the permit application and other information available to <br />the Division, the Division finds that surface coal mining and reclamation has been feasibly <br />accomplished at the Chimney Rock Mine (2.07.6(2)(b)). <br />3. The assessment of the probable cumulative impacts of all coal mining in the general area on <br />the hydrologic balance, as described in 2.05.6(3), has been made by the Division. This assessment <br />entitled "Chimney Rock Cumulative Hydrologic Impact Assessment" is available for inspection at <br />the offices of the Division. The Division finds that the operations proposed under the application <br />have been designed to prevent damage to the hydrologic balance outside the proposed permit area <br />(2.07.6(2)(c)). <br />