Laserfiche WebLink
<br /> <br />5) The segment of access road crossing Union Meadow should be removed. At <br />the time of our site visitation, it was incomplete, and was ponding water <br />on the existing floodplain. <br />There appear to be two possible approaches to reclamation for this project. <br />One solution is the normal, final reclamation which is designed to be <br />long-term and maintenance-free. The second solution is a "moth-ball" solution <br />in which sufficient reclamation is completed to control erosion, runoff, sediment, <br />etc. with the operator committing to maintenance of the system. The "moth-ball" <br />solution is temporary and must eventually start up or proceed to final reclamation. <br />cc: Jim Pendleton <br />Rox Cox <br />Jim McRrdle <br />JZ:ys <br />