Laserfiche WebLink
Chen and assoc~ites, inc. <br />CONSULTING GEOTECHNICAL ENGINEERS <br />5080 Rtl t5~t <br />Gienwootl Springs. C08r60t <br />TO:, West Elk Coal Company <br />PO Box 591 __ <br />Somerset CO 81434 <br />Attn: Rocky Rotuman <br />CONSTRUC~N ACTIVITIES REPORT <br />J08 NO. ~4' I DATE_ ll/~/8? <br />DAILY REPORT NO. 1 ` SHEET 1 OF ~ <br />SUBJECT: (Vest Elk ~a~Qm any _ <br />WEATHER CONDITIONS AND TEMPERATURE Clear and cold <br />CONTRACTOR'S EQUIPMENT <br />i <br />{CONSTRUCTION ACTIVITIES The contractor laced fill in the cut for the portal <br />i entrance to the Bear Mine today. The contractor started placing fill on frozen fill rh <br />~! a.m. Informed Kirk Nobis with {Vest Elk Coal Comoany of this Kirk instructed the <br />{ contractor i0 push the material placed into a Wile at the west end of the fill and <br />to break up the frozen material in the rest of the areas M~n~mal fill was nlaced <br />and no density tests were taken. _ <br />11 <br />i <br />{ i <br />VERBAL COMMUNICATION WITH CONTRACTOR, ENGINEER, ARCHITECT, OWNER <br />Lockhart <br />FIELD REPRESENTATIVE <br />Ronald J Vasquez <br />APPROVED BY <br />s <br /> <br />