Summary and Conclusions <br />Based upon a review of the approved permit application, the applicant's bond release application, <br />and site inspections,the Division finds that P&M has completed backfilling, grading and drainage <br />reestablishmentonthe proposed release areas in accordance with the approved reclamation plan. <br />IV. PROPOSED DECISION <br />Based on the observations above, the Division proposes to approve P&M's request for Phase I <br />bond release on portions of the Edna Mine. This proposed decision will release the applicant <br />from liability for backfilling, grading, and drainage reestablishment on the West Ridge azea and <br />a portion of the Center Ridge azea. The specific areas aze located in Township 4 North, Range <br />86 West of the 6th Principal Meridian, further described as follows: <br />Center Ridge: <br />Section 24 - SE'/,; SE'/, NW'/,; NE'/,E'/z; SW'/a, NE'/,NE'/,; NW'/,; SE'/, <br />West Ridge: <br />Section 13 - NE'/,; NW'/,SE'/,; NW'/,SW'/,; NW'/, W'/z; NW'/,; NE'/W%z; SW'/,; <br />NE'/,SW'/,W'h; SE'/, W'/z; SW'/,; SE'/,. <br />Section 14 - SE'/, <br />Section 23 - E''/z; NW'/,; NE'/,E'/z; NE'/,; NW'/,. <br />Section 24 - SE%; NW%,W%z; NW%; NE%1~~%z; SW'/,; NE%NW'/,; SW%NE%; <br />The Division holds a performance bond of $7,171,716.00 for the Edna Mine. The Division <br />proposes to release $821,613.00. The remaining $6,350,103.00 is sufficient to assure completion <br />of the remaining reclamation work at the site if the work had to be performed by the Division, <br />including the cost of reestablishing vegetation on any revegetated areas, should those areas fail. <br />The Division estimates its cost to complete remaining reclamation work at the site to be <br />$6,350,103.00. <br />There is no remaining reclamation work which remains to be done in the proposed release azea. <br />The Division is, however, retaining that portion of the performance bond that applies to topsoil <br />redistribution and revegetation, since a request for Phase II or III release has not yet been granted. <br />The entire performance bond is being retained for the remainder of all permitted areas other than <br />the proposed release azea. <br />Any person with a valid legal interest which might be adversely affected by this proposed <br />Edne Mine 4 Bond Release No. ? <br />