My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-04-12_GENERAL DOCUMENTS - M1974052
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1974052
>
1999-04-12_GENERAL DOCUMENTS - M1974052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 5:51:47 PM
Creation date
11/23/2007 6:51:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974052
IBM Index Class Name
General Documents
Doc Date
4/12/1999
Doc Name
WORK PLAN VARRA COAL ASH BURIAL PROJECT WELD CNTY COLO CGRS 1-135-2755
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CGRS, Inc. • • <br /> Another important aspect of the QA/QC program is the communication between the QA/QC <br /> ' organization and the project manager. Regular appraisal by the project manager of the quality <br /> aspects related to the ongoing project data-gathering efforts provides the mechanism whereby the <br /> ' established objectives may be met. <br /> ' QA/QC procedures should provide details relating to the schedule, information to be provided, and <br /> the mechanism for reporting to the project manager. Reports to the project manager should <br /> include: <br /> ' • Periodic assessment of measurement data accuracy, precision, and completeness; <br /> • results of performance audits; <br /> ' • Results of system audits; <br /> • Significant QA/QC problems and recommended solutions; and <br /> ' • Resolutions of previously stated problems. <br /> ' The individual responsible for preparing the periodic reports should be identified. These reports <br /> ' should contain a separate QA/QC section that summarizes data quality information. The Quality <br /> Assurance Project Plan is presented as Attachment C. <br /> ' 8.0 REMARKS <br /> ' The scope of work is based upon current available information and our understanding of this <br /> project. As the project develops, changes to the project scope of work may be required. If changes <br /> ' in the scope of work are dictated by the needs of the project, these changes will be presented prior <br /> to implementation. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.