Laserfiche WebLink
<br />Mr. David L. Bucknam <br />5 <br />Concerning resumption of reclamation activities, such activities <br />had ceased at the time of AFO's site visit, and MLRD personnel <br />indicated the reason as being that legal action was first <br />necessary to have the conveyor system removed. If this is not <br />the case, please advise AFO as to the reason reclamation <br />activities had ceased and when they are expected to resume. <br />Concerning the exposed coal seam, please note during the next <br />site visit that a "rider" seam is exposed in the highwall above <br />the backfill. <br />5. Hawk's Nest <br />The reference to the Board of Oil, Gas and Mining is being <br />changed as requested. <br />The discussion concerning the silos is being modified to reflect <br />MLRD's position that removal of the silo structures is not <br />required. <br />6. CEC <br />The reclamation plans and bid package were not available for <br />review during AFO's visit to your office in May. Please provide <br />copies of these documents to AFO for review. <br />Please provide the above requested information by October 18, 1991, so <br />that AFO may finalize the evaluation documents. <br />If there are any questions, please call Brian Smith or me at (505) <br />766-1486. <br />Sincerely, <br />