Laserfiche WebLink
~ 4 <br />4. As part of the demonstration cross sections of the highwall azea including the County <br />road and sandstone outcrops above the highwall should be submitted and show: <br />a. That the if the slope was backfilled from the edge of the bench to the top of the <br />high wall that it would be unstable (the Division maintains that the slope from <br />the County road up to the edge of the portal bench is the embankment of the <br />County road). <br />b. Across section showing that to completely backfill the highwall to a stable <br />configuration that the County road would be covered. <br />c. The final cross section should show the reclaim slope as it is proposed in the <br />current reclamation plan with stable reclaimed slopes, highwall and the three to <br />five foot buffer on the portal bench above the county road embankment. <br />Since the Apex mine is will no longer be in temporary cessation the Division will need a letter <br />from you stating that the Apex Mine will be actively reclaiming the site. <br />Greg Lewicki informed me that he will be doing the reclamation at the mine site. If you have <br />any questions please feel free to call me. <br />Sincere , <br />~~ <br />Randall P. Price <br />Reclamation Specialist <br />RPP/rpp <br />cc: Greg Lewicki (w\enclosures) <br />Apex No. 2 Mine, C-81-011 <br />2 <br />September 23, 1992 <br />