My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30808
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:15 PM
Creation date
11/23/2007 6:48:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Name
Guidance Document
From
Stormwater Permit Folder
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metal Mining SWMP Guidance Document <br />Page 11 <br />(The following two paragraphs aze from Part I.D.S of the permit.) <br />a. Active Mining Operations. Qualified personnel identified by the operator shall make a thorough <br />inspection of their stormwater management system, at least twice per year (in the spring and fall). <br />Where semi-annual site inspections are shown in the plan to be impracticable because an <br />employee is not stationed or does not routinely visit the site, inspections as required in this part <br />shall be conducted at appropriate intervals specified in the plan, but never Zess than once in two <br />years. These inspections must be documented and summarized in the Annual Report (see Part <br />I.E.1 of the permit). <br />1) Disturbed areas and areas used for material storage that are exposed to precipitation shall be <br />inspected for evidence of, or the potential for, pollutants entering the drainage system. Erosion <br />and sediment control measures identified in the SWMP shall be observed to ensure that they are <br />operating correctly. <br />List the items to be inspected (manufacturing azeas, fuel storage and transmission facilities, materials storage <br />azeas, structural BMPs, SPCC effectiveness, good housekeeping practices, etc.). Sites with limited industrial <br />activity will have a correspondingly low level of inspection activity required. <br />O->~X the azeas at the mine which aze covered by your SWMP (see discussion, Item 2 above) need to be <br />inspected under this part. <br />Keep in mind that the semi-annual comprehensive inspections will need to be c~~mmarized and reported in your <br />Annual Report. <br />6. Consistence with Other Plans <br />SWMPs may reflect requirements for Spill Prevention Control and Countermeasure (SPCC) plans <br />under section 31I of the CWA, or Best Management Practices (BMPs) Programs otherwise required <br />by a CDPS permit, and may incorporate any part of such plans into the SWMP by reference. The <br />SWMP may rely upon information developed for other similar pollution control programs, including <br />the Mined Land Reclamation Plan. Appropriate portions of these other plans may be incorporated <br />in the SWMP by reference, as long as a complete SWMP can be reproduced and submitted to the <br />requesting agency within the time frame specified in the request. Those portions of the referenced <br />documents must be included in the submittal The SWMP must also be readily available to an on- <br />site inspector. <br />If the facility, or a portion of it, is already regulated through another program which requires such things as <br />SPCC plans or good housekeeping measures, these can be included by reference. <br />INACTIVE MINES including MINES SEEKING PERMIT TERII~VATION <br />Many of the elements of a SWMP for an inactive mine aze similaz to those for an active mine, but on a reduced <br />scale. See the previous sections for a discussion of these individual items. Item 5 below addresses specific <br />SWMP requirements for mines seeking eventual permit termination through mine-waste remediation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.