Laserfiche WebLink
Mr. Dan Matheaa <br />Division ofMineraLr and Geology <br />Page 2 <br />• Sediment Pond 015 controls runoff and sedimentation from the azea, which is located downstream Ekom the slide <br />azea. <br />• There is no risk to human health and safety. <br />Therefore, the actual damage to the environment is minimal <br />Proposed Remediation: <br />There is an estimated 25,000 cubic yards of material associated with the total slide. SCC is currently evaluating options <br />and alternatives to remediate the slide. The azea must "dry out" before in-depth evaluations can be conducted. Once <br />the evaluations aze completed, SCC will submit a remediation plan and associated timetable. <br />If the Division has questions or comments, please contact me at (970) 276-5127 or (970) 846-3648. <br />Sincerely, <br />~i~ <br />Roy A. Kazo <br />Reclamation Manager <br />Seneca Coal Company <br />