Laserfiche WebLink
~~ <br />-2- <br />station, the ventilation fan, the crusher pit and shed, the concrete portion of the coal <br />recovery tunnel, and the gravel till associated with the tipple area. [f TR-18 is not <br />approved Sun Coal Company will reclaim the above mentioned structures by February <br />28, 1996 (60 days after the extension date). The Yampa River sediment pond is included <br />in the list of structures to be considered as permanent in TR-18. <br />Sincerely, <br />Edith A. Savage <br />President <br />cc: Bryan Archer, Sun Coal Company, Inc. <br />