My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-28_GENERAL DOCUMENTS - C1994082
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
2006-02-28_GENERAL DOCUMENTS - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 3:02:33 PM
Creation date
11/23/2007 6:47:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
2/28/2006
Doc Name
Proposed Decision & Findings of Compliance for PR2
From
Change Mine Plan
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br />Surface Water Monitoring <br />Site Name Discharge Water Qualit yr' <br />YSSF3 Triannual Triannual <br />YSS2 Monthly Monthly/Triannual <br />YSGFS Triannual Triannual <br />YSGS Triannuale Triannuala <br />NPDES Sites See Page 25 <br />Sprinqs <br />YSSPGI Semiannual Semiannual <br />Discharge measurements (both continuous and monthly) will be conducted March - <br />October only. <br />Water Quality Monthly = field parameters only (pH, temperature, and electrical <br />conductivity), March through October only. <br />Water Quality Triannual = Water samples will be analyzed according to the surface <br />water parameter list as given in the permit in Table 15-5 during snowmelt runoff <br />(April), post-runoff (May or June), and baseflow (September). <br />Semiannual is May/June and September/October, and includes field parameters and <br />the list of parameters in Table 4 of this document. <br />"If flow is less than 5 gallons per minute, then only field parameters will be <br />measured. <br />aFor site YSGS, triannual discharge measurements and water quality samples (total <br />dissolved solides) will take place during May, July, and September. <br />Yoast Mine 44 February 28, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.